Customer Story
How Walsh performs QA/QC on the Orange County Sanitation District Seal Beach Pump Station Replacement Project
Company type
Industry sector
Project type
Pump Station Replacement
The Challenge: Complex Coordination in a Confined Space
Walsh is building a new pump station for the Orange County Sanitation District at Seal Beach. It replaces a station that was built in the 1970s, and adds odor control systems and a backup generator. Coordination is the main challenge. “We have a very tight working space and it’s constantly a challenge to be coordinating everything together. There’s not a lot of room for error,” says Benjamin Haymond.
The Solution: On-Site BIM Verification with GAMMA AR to Prevent Rework
The station is full of embeds, “including structural steel, pipe penetrations, a lot of mechanical and electrical work,” so the team uses GAMMA AR to check them on site. “We’ve been able to use our model and actually bring it down into the pump station. See it in real life and compare it to the work as we’re putting it in,” says Catherine Garrett. “It gives us a chance to make sure that as we install work, we are actually doing it correctly and in the right locations according to our model.” They log issues on site, such as “pipe supports at wall 10A,” and each one captures the floor plan, a site photo and “a picture of the model up against the actual as built.” It was easy for the team to pick up: “even the first week when we had it out here, one of our superintendents, he just picked it up on the app on his iPad and just started walking around looking at all our embeds.” Benjamin concludes: “It saves you a lot of time and rework… already the app has paid for itself.”